THE HOME SITE IN ITS RAW STATE, BEFORE THE FUN BEGINS
NOW THE FUN HAS BEGUN. BIG JOHN IS EXCAVATING YOUR FOUNDATION
CREW STARTS TO LAY OUT FOOTINGS FOR YOUR NEW HOME WITH GPS & LASERS
CONCRETE STRUCTURAL FOOTINGS ARE POURED
A THOMPSON POURED WALL CREW LAYS OUT THE FOUNDATION WALLS
GRAVEL IS PLACED BELOW THE LOWER LEVEL SLAB FOR SUPPORT AND WATER DRAINAGE
MARCEL CONSTRUCTION HAS JUST POURED THE CONCRETE FLOOR SLAB
STRUCTURAL STEEL PROVIDED BY SUBURBAN STEEL IS SET IN PLACE
OUR FRAMING TRADE-PARTNER HAS STARTED ONE OF THE MOST FUN PARTS OF THIS NEW HOME
SHE GOES UP
AND UP
TRUSSES DELIVERED BY THE LUMBER YARD ARE BEING SET IN PLACE BY, COUNT THEM, 9 CREW
OUR FRAMING PARTNER IS CREATING THE ROOF SYSTEM
IT TAKES SHAPE
ICE GUARD, PROTECTIVE PAPER, HOUSE WRAP AND CERTAINTEED SHINGLES AND ARE ON.
AN INSIDE LOOK AT THE FRESHLY-SWEPT FLOORS
ROTEN ROOFING TAKES CARE TO COVER OUR NEW HOMES TO PROTECT YOUR FAMILY FROM THE ELEMENTS
HAMILTON PARKER’S FIREPLACE HAS JUST BEEN SET IN PLACE AND READY TO BE WIRED UP
BEFORE…
AFTER.
HEATING, COOLING, ELECTRICAL, AND PLUMBING ARE NOW BEING LAID OUT FOR YOUR WALKTHROUGH
MUCH TO DO. STONE IS BEING SET. SHINGLES ARE NEAR COMPLETION. BRICK AND STUCCO ARE BEING LAID UP.
THESE SERIOUS LADDERS BELONG TO THE INSULATION CONTRACTOR. THEY NEED THEM TO INSULATE EVERY NOOK AND CRANNY.
INSULATED HVAC DUCTS AND WIRING IN THE ATTIC
THE SHEETROCK WAS JUST DELIVERED TO THE HOME. WE CONSIDER THIS THE HALF-WAY POINT
THE SHEETROCK IS UP
RAW MAN CAVE
CAPITAL CITY MILLWORK JUST DELIVERED THE INTERIOR WOODWORK. SIMS LOHMAN HAS SET THE CABINETS
BERNARDO STUCCO IS APPLYING THE SECOND COAT OF STUCCO TO THE EXTERIOR
THERE’S MIKE. NOTICE HOW HE HAS PROTECTED THE WINDOWS
STUCCO IS DONE. DON’T FORGET TO TAKE DOWN THE SCAFFOLDING!
GETTING CLOSE… ON THE OUTSIDE AT LEAST
NOW FOR THE CUSTOM, COZY LIBRARY PANELING
STAIN TEST SAMPLE, WAITING ON APPROVAL BY THE OWNER
HARDWOOD FLOORING JUST DELIVERED BY AMERICA'S FLOOR SOURCE AND CHAD HAS BEGUN THE CUSTOM BUILT-IN WOODWORK
TAPED AND SANDED
AMERICA'S FLOOR SOURCE JUST INSTALLED OAK FLOORING AND THE 1ST COAT OF SHERWIN-WILLIAMS PAINT IS DRYING
THE FIRST COAT OF “BUCKEYE” GREY IS ON IN JACK’S ROOM
REMEMBER THOSE STUDY WALLS…
MUDROOM CUBBIES BUILT & PAINTED. MR. LEE IS LAYING THE FLOOR TILE, TAKING CARE TO PROTECT THE WOODWORK
SIMS LOHMAN READY TO INSTALL GRANITE COUNTERTOPS SELECTED AT THE SHOWROOM AND 'BONEYARD'
BEFORE…
AFTER. (BUCKEYE BACKSPLASH)
LOVE SEEING TON OF TRUCKS & COOL EQUIPMENT TOO. NOTICE CUSTOM ROUND GUTTERS BY DONLEY
KITCHEN STARTING TO TAKE SHAPE NOW THAT FERGUSON HAS DELIVERED LIGHTING
AMERICA’S FLOOR SOURCE IS INSTALLING THE DENSE PADDING IN THE LOWER LEVEL
FINISHED STAIRCASE
A NICHE
FARM SINK W/ INSTANT HOT WATER FOR YOUR MORNING COFFEE & FILTERED WATER TO SAVE ON BOTTLES
AS THE SOD GUYS SAY AT WILSON TURF, “GREEN SIDE UP”
THE MASTER SHOWER IS NOT QUITE READY. THE TILE JUST CAME IN FROM ITALY
MIRRORS TO BE INSTALLED NEXT
NICE VANITY
CUSTOM STAIR RUNNER GOING UPSTAIRS WITH TWO-TONE PAINT
ALL LIT UP
BEFORE…AFTER.
CHEERFUL LAUNDRY WITH APPLIANCES YOU’LL FIND AT FERGUSON ENTERPRISES
CLEANER NOW
READY FOR AREA RUGS AND FURNITURE AND “THE BIG GAME”
A COOL CEILING DETAIL WE CAME UP WITH “ON THE FLY” FOR THE GREAT ROOM
TA DA!